Nutrilite, Ca

Nutrilite 9/2012

  • Demolish and remove the existing building 7 in its entirety. All existing improvements, concrete tilt-up walls, 2 levels of offices and a concrete loading dock at the south elevation.
  • The project status is Gold LEED.