San Diego, CA

Hilton Bay Front Hotel 12/2012

  • Dice all concrete paving into 4 X 4 pieces for a dust free environment.
  • Demo and remove 28,000 square feet of existing concrete pool deck in the existing event area.
  • Demo and remove all existing concrete plantar walls, ramps, and stairs.